QR Code

Appropriations Requests

Water Resource Development Act Reauthorization (WRDA)

 

Authorization of Missouri River Studies

Total Cost: N/A

Location: Missouri River Tributaries in Iowa

Description: The purpose of this request is to authorize corps studies to identify opportunities for increased flood risk management, sustainable channel/ecosystem restoration, and protection of critical infrastructure in the tributary basins to the Missouri River in Western Iowa.

 

Cedar River, Cedar Rapids, Iowa Flood Risk Management Project

Total Cost: $315,000,000 - $375,000,000

Location: Cedar Rapids, Linn County, Iowa

Description: The Purpose of this request is to authorize the Cedar River Flood Risk Management Project and for that project,1) to waive the regular cost-benefit ratio requirement for Army Corps of Engineer Projects in order to construct the crucial flood control projects along the Cedar River, and 2) to allow funds spent on normally considered matchable activities by the City of Cedar Rapids, other local entities, and the State of Iowa to be counted, regardless of when those expenditures are made, as long as they were made after the date of the 2008 floods.

 

Consideration of Nonstructural for Section 14 of the Flood Control Act of 1974

Total Cost: N/A

Location: Any Applicable Stream bank/shoreline within the Army Corps of Engineers Omaha District

Description: The purpose of this request is to modify existing bill language to allow nonstructural alternatives to be considered and implemented under Section 14 of the Flood Control Act of 1974, which currently authorizes the construction, repair, restoration, and modification of emergency stream bank and shoreline protection works to prevent damage to important infrastructure and non-profit public service buildings.

 

Greenbelt Authority Modification - Change Eligible Work Match

Total Cost: N/A

Location: Des Moines River from Fort Dodge to Pella, Iowa

Description: The purpose of this request is to modify existing bill language to allow local project sponsors to count as match work done by the sponsor or those on behalf of the sponsor in excess of the current 6% limit regarding architectural and engineering work.

 

Greenbelt Authority Modification - Expansion of Boundaries

Total Cost: N/A

Location: Webster County, Iowa

Description: The purpose of this request if to modify existing bill language to expand the boundaries of the Des Moines Recreational River and Greenbelt project to include two additional half sections in Webster County, IA.

 

RiverVision Floodplain Management Demonstration Project

Total Cost: $30,000,000

Location: Davenport, Scott County, Iowa

Description: The purpose of this project is to transform a riverfront brownfield in Davenport into a demonstration project of national significance for cost-effective, environmentally-responsible floodplain management on the Upper Mississippi River. The City of Davenport is the largest inland city in the nation along a major river where the downtown is not protected by a traditional flood control project.